Mosaic Art Group (Demo)
2400 Gallery Commerce Dr
Fairview, TX 75069
(555) 010-4000
INVOICE 070723
Date 06/23/2025
Order 040723
Terms Net 30, due 07/23/2025
Bill to
Copper Leaf Framing (1003)
8285 Lamar St
Pine Bluff, AR 71601
Copper Leaf Framing (1003)
8285 Lamar St
Pine Bluff, AR 71601
| Item | Description | Unit | Shipped | Price | Disc | Amount |
|---|---|---|---|---|---|---|
| S2002 | Dust cover paper 36 in x 100 ft roll | RL | 3 | $19.80 | $59.40 | |
| W3100 | Gallery Black 1/2 in step 1 CHOP 20 X 24 1 frame x 8.00 ft = 8.00 ft @ $2.72 | FT | 8.00 | $2.72 | 3% | $21.11 |
| Subtotal | $80.51 |
| Sales tax | $0.00 |
| Invoice total | $80.51 |
* not taxable. Moulding is billed by the foot: frames x footage per frame (perimeter plus 8 x moulding width, rounded up to the next third of a foot).